Full-scale experimental and numerical investigation on the ductility, plastic redistribution, and redundancy of deteriorated concrete bridges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

2
6

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 61 publications
0
4
0
Order By: Relevance
“…The peculiarity of this structure was that during its construction, all fourteen VTK-33u beams of The data analysis given in Table 2 shows that the bending moments in beams No. 1,2,3,4,11,12,13 in superstructure No. 1, after laying the overhead slab and asphalt pavement, have an insignificant value and there is a deflection in beam No.…”
Section: Methodsmentioning
confidence: 99%
“…The peculiarity of this structure was that during its construction, all fourteen VTK-33u beams of The data analysis given in Table 2 shows that the bending moments in beams No. 1,2,3,4,11,12,13 in superstructure No. 1, after laying the overhead slab and asphalt pavement, have an insignificant value and there is a deflection in beam No.…”
Section: Methodsmentioning
confidence: 99%
“…In addition, the dense-girder arrangement increases the transverse force-transmission paths of the structural system and improves the redundancy and robustness of the system when dealing with extreme loads or disaster situations [40]. When local members fail, the stress of the structure be can easily redistributed due to the strong composite bridge deck and girder-end crossbeams and the further spread of damage can be significantly limited by using alternate transmission paths to distribute the loads to other H-shaped girders.…”
Section: Dense-girder-h-shape Composite Girdermentioning
confidence: 99%
“…At present, inspections and safety diagnoses are regularly performed for the maintenance of bridges, and the load-carrying capacity of bridges is evaluated to identify their performance degradation and level of deterioration [12][13][14]. In general, the vehicle loading test is conducted to evaluate the load-carrying capacity of a bridge [15][16][17].…”
Section: Introductionmentioning
confidence: 99%