2014
DOI: 10.1016/j.ins.2014.03.060
|View full text |Cite
|
Sign up to set email alerts
|

Fuzzy job-shop scheduling problems: A review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
52
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 81 publications
(52 citation statements)
references
References 76 publications
0
52
0
Order By: Relevance
“…Similar results on the same instances for GPSO, RKGA and a new ant bee colony (ABC) algorithm are given in [71]. Notice that these are the instances referred to as "Lei's" in [1], since the same original instances and fuzzification method is used by one of the authors in [39]; however, the results reported in this late paper correspond to a variant of FJSP considering the additional constraint of preventive maintenance, together with the corresponding additional data for the benchmark instances. HDPSO [41] (max R , < R ) Y RKGA [36] (max R , < R ) MA1 [25] (max I , < E ) HDPSO [41] (max R , < R ) Y RKGA [36] (max R , < R ) MA1 [25] (max I , < E )…”
Section: Fuzzified Instancesmentioning
confidence: 63%
See 3 more Smart Citations
“…Similar results on the same instances for GPSO, RKGA and a new ant bee colony (ABC) algorithm are given in [71]. Notice that these are the instances referred to as "Lei's" in [1], since the same original instances and fuzzification method is used by one of the authors in [39]; however, the results reported in this late paper correspond to a variant of FJSP considering the additional constraint of preventive maintenance, together with the corresponding additional data for the benchmark instances. HDPSO [41] (max R , < R ) Y RKGA [36] (max R , < R ) MA1 [25] (max I , < E ) HDPSO [41] (max R , < R ) Y RKGA [36] (max R , < R ) MA1 [25] (max I , < E )…”
Section: Fuzzified Instancesmentioning
confidence: 63%
“…A first review of benchmark datasets for fuzzy job shop is already included in [1]; here we elaborate on the information given in that survey and complement it with data that allows for fair and rigorous comparisons of different proposals from the literature. We shall analyse the results reported for those instances, taking into account both the objective function considered in each case as well as the fuzzy arithmetic used (maximum approximation and order relation), this being a key issue for meaningful comparisons.…”
Section: Review Of Existing Benchmarksmentioning
confidence: 99%
See 2 more Smart Citations
“…This model has been extensively used in the fuzzy scheduling literature [1]. However, when TFNs are to be used to extend the job shop to handle uncertainty, two issues must be addressed: the establishment of an order relation between TFNs and the means of extending the arithmetic operations of addition and maximum to work with TFNs (so to compute starting and completion times).…”
Section: Uncertain Durationsmentioning
confidence: 99%