2013 Annual IEEE India Conference (INDICON) 2013
DOI: 10.1109/indcon.2013.6726002
|View full text |Cite
|
Sign up to set email alerts
|

Generator rescheduling for congestion management with incorporation of wind farm using Artificial Bee Colony algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 15 publications
(12 citation statements)
references
References 18 publications
0
12
0
Order By: Relevance
“…A comparative analysis is presented with other algorithms to put forward the efficiency of the proposed CM approach. The comparison has been established with RED [35], PSO [36], ABC [37], FFA [38]. The CM problem has also been analyzed with some latest techniques GWO, − constraints, and DA and the results of these approaches are also included in this research article for comparative analysis purpose.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…A comparative analysis is presented with other algorithms to put forward the efficiency of the proposed CM approach. The comparison has been established with RED [35], PSO [36], ABC [37], FFA [38]. The CM problem has also been analyzed with some latest techniques GWO, − constraints, and DA and the results of these approaches are also included in this research article for comparative analysis purpose.…”
Section: Resultsmentioning
confidence: 99%
“…Table 4 represents the outcomes brought about with the incorporation of proposed BA technique for the CM problem. The results reported in the literature [35][36][37] Table 4 for a comparative analysis. The congestion cost of 7751.36 $/h is obtained with the proposed BA method and is minimum amongst the congestion costs achieved with the other existing techniques.…”
Section: Modified 39-bus New England Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…In [7], the zonal congestion management approach is carried out by the optimal rescheduling of real and reactive power generator. In [8], the generator rescheduling with incorporation of wind farm in the system is analysed. Wind farm is selected based on power transfer distribution factors.…”
Section: Literature Surveymentioning
confidence: 99%