Computing in Civil Engineering 2013
DOI: 10.1061/9780784413029.106
|View full text |Cite
|
Sign up to set email alerts
|

Grand Challenges in Data and Information Visualization for the Architecture, Engineering, Construction, and Facility Management Industries

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 16 publications
0
8
0
Order By: Relevance
“…Meanwhile, another approach augmented traditional Gantt charts and network diagrams with annotations and highlights [36]. More recent surveys indicated emerging challenges related to visual analysis and exploration of large datasets [37], [38].…”
Section: Bim Visualizationsmentioning
confidence: 99%
“…Meanwhile, another approach augmented traditional Gantt charts and network diagrams with annotations and highlights [36]. More recent surveys indicated emerging challenges related to visual analysis and exploration of large datasets [37], [38].…”
Section: Bim Visualizationsmentioning
confidence: 99%
“…Next, committee members were divided into three focus groups including visualization, information modeling, and simulation, by the area of their interests. Three groups then grouped and sorted the list of identified VIMS grand challenges by culminating with 17 grand challenges for each of the three knowledge areas (i.e., six for visualization, five for information modeling, and six for simulation), as given in Table 1 ( Golparvar-Fard et al 2013;Leite et al 2013;Lee et al 2013). Each of the aforementioned challenges will be discussed in the "Grand Challenges" section.…”
Section: Identification Of Vims Grand Challengesmentioning
confidence: 99%
“…In contrast, schedulers and procurement managers need to know the quantitative construction work progress, such as the quantity of materials in stock, to make decisions about scheduling and procurement. Golparvar-Fard et al (2013) identified four current challenges in visualization output format and medium, including (1) managing 3D BIM on interoperable protocols to support queries in multiple/individual (2) visualizing semantic models using web-based interfaces accessible on mobile devices; (3) enabling multiple-use real-time environments in which users can combine partial BIMs, linking BIM to GIS, and sharing with cloud-based tools; and (4) identifying quantitative methods to measure the efficiency of visualization. Addressing these challenges through the collaboration of academia and industry with shared perspectives will help in understanding the most suitable format and medium for each discipline.…”
Section: Output Formats and Mediums Suited For Constructionmentioning
confidence: 99%
“…According to the results of current studies conducted by Golparvar-Fard et al (2013) and Becerik-Gerber et al (2013), monitoring the health of infrastructure is one of the most imposing challenges faced by civil engineers in the 21 st century. Lack of viable methods to map and label existing built infrastructure is an important component of this challenge.…”
Section: Introductionmentioning
confidence: 99%