2018
DOI: 10.1002/qre.2348
|View full text |Cite
|
Sign up to set email alerts
|

Graphical analysis for overall effectiveness management: A graphical method to support operation and maintenance performance assessment

Abstract: This article presents a graphical tool for the monitoring of performance indicators called GAOEM (Graphical Analysis for Overall Effectiveness Management). GAOEM comprehends the main indicators of maintenance and operations management, and it constitutes an adaptation of the overall effectiveness index. GAOEM facilitates control and analysis by using specific indicators in a graphic panel, designed for industries with high investment in physical assets. It also facilitates an efficient reading and interpreting… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 43 publications
0
5
0
Order By: Relevance
“…To compose its definition for industry 4.0, this study builds on concepts established by Schumacher et al (2016), Porter and Heppelmann (2014), and De Sousa Jabbour et al (2018).…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…To compose its definition for industry 4.0, this study builds on concepts established by Schumacher et al (2016), Porter and Heppelmann (2014), and De Sousa Jabbour et al (2018).…”
Section: Discussionmentioning
confidence: 99%
“…De Sousa Jabbour et al (2018), characterize industry 4.0 as a vigorous industrial wave, servicecentered and driven by digital technologies. While Schumacher et al (2016), explain disruptive technologies facilitate horizontal and vertical integration of production and enterprises, requiring a new set of capabilities.…”
Section: Project Managementmentioning
confidence: 99%
“…Based on the hazard plotting method (Nelson, 1969), a data-based graphical tool, Graphical Analysis for Maintenance Management (GAMM), is proposed to visualize the maintenance sequence versus the cumulated run time (Mart ınez et al, 2013). The Graphical Analysis for Operation Management Method (GAOM) takes both maintenance and production data into consideration (Viveros Gunckel et al, 2017), while Graphical Analysis for Overall Effectiveness Management (GAOEM) further integrates graphic interaction between reliability and production indicators (Viveros Gunckel et al, 2018). These tools use two-dimensional graphic illustrations for each equipment or system, making these methods more suitable for application to critical equipment with higher maintenance frequency.…”
Section: Literature Reviewmentioning
confidence: 99%
“…, 2013). The Graphical Analysis for Operation Management Method (GAOM) takes both maintenance and production data into consideration (Viveros Gunckel et al , 2017), while Graphical Analysis for Overall Effectiveness Management (GAOEM) further integrates graphic interaction between reliability and production indicators (Viveros Gunckel et al. , 2018).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Recently, Viveros et al [18] proposed a sustainable manufacturing measurement infrastructure that allows indicators to be measured within the manufacturing environment and considers the possibility of aggregation at all levels of the organization.…”
Section: Introductionmentioning
confidence: 99%