2021
DOI: 10.1051/e3sconf/202125809079
|View full text |Cite
|
Sign up to set email alerts
|

Green building investment control system based on a three-dimensional parametric model of the green building

Abstract: Investment in construction projects is a rather complex process. The customer of construction product, as a rule, is also its investor and for him the systematization of information about the construction process is a necessity. Construction investment control (CIC) is an integral part of the building construction process. Such control is a separate service that is necessary for the customer to objectively understand the installed work volumes and forecast deadlines. Completed construction and installation wor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 15 publications
0
3
0
Order By: Relevance
“…The BIM applications can be divided into BIM 3D, BIM 4D, BIM 5D, and BIM 6D according to their functions and application aspects [54,[104][105][106][107][108]. To clarify, 3D means that BIM can provide detailed 3D model simulations of buildings [109][110][111][112][113][114][115][116]. BIM 4D integrates BIM 3D with the time dimension, so BIM 4D can simulate the green building construction process to support the schedule development and revision, constructability analysis, clash detection, and other functions [117][118][119][120][121][122].…”
Section: Planning and Schedule Management Optimizationmentioning
confidence: 99%
See 2 more Smart Citations
“…The BIM applications can be divided into BIM 3D, BIM 4D, BIM 5D, and BIM 6D according to their functions and application aspects [54,[104][105][106][107][108]. To clarify, 3D means that BIM can provide detailed 3D model simulations of buildings [109][110][111][112][113][114][115][116]. BIM 4D integrates BIM 3D with the time dimension, so BIM 4D can simulate the green building construction process to support the schedule development and revision, constructability analysis, clash detection, and other functions [117][118][119][120][121][122].…”
Section: Planning and Schedule Management Optimizationmentioning
confidence: 99%
“…In the process of green building construction, 3D visual modeling is of significant importance to the construction organization [48,54,97,98,[104][105][106][107][108][109][110][111][112]116]. It can demonstrate the entire green building project, the interior structures, and components in 3D [4,5,51,54,76,77,[104][105][106].…”
Section: Bim Utilization In the Green Building Construction Phasementioning
confidence: 99%
See 1 more Smart Citation