High level waste interim storge architecture selection - decision report

Abstract: This document has been reviewed by WHC and DOE-RL s t a f f and requested. Provide any s i g n i f i c a n t comments t o R. B. Calmus v i a c c m a i l by r e q u i r e d response date. comments dispositioned. F i n a l review and approval 11. Receiver Remarks: 11A. Design Barnsline Docunent? [ ] Yes b] No 807400-172-1 l07/90

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

1996
1996
1999
1999

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 1 publication
0
7
0
Order By: Relevance
“…The other project designs and constructs new facilities to accommodate Phase 2 HLW products. The selection bases for these projects initially were discussed in WHC-SD-WM-TA-183, High-Level Waste Interim Storage Architecture SelectionDecision Report (Calmus 1996b Cs/%r capsules are not included in the Phase 1…”
Section: Immobilized High-level Wastementioning
confidence: 99%
See 1 more Smart Citation
“…The other project designs and constructs new facilities to accommodate Phase 2 HLW products. The selection bases for these projects initially were discussed in WHC-SD-WM-TA-183, High-Level Waste Interim Storage Architecture SelectionDecision Report (Calmus 1996b Cs/%r capsules are not included in the Phase 1…”
Section: Immobilized High-level Wastementioning
confidence: 99%
“…HNF-3899, Immobilized High-Level Waste Interim Storage Alternatives Generation and Analysis and Decision Report (Calmus 1999a (Calmus 1996b) Responsible Organization…”
Section: Inter-related Documents (Successors and Predecessors)mentioning
confidence: 99%
“…The other project will design and construct new facilities to accommodate Phase 2 HLW products. The selection bases for these projects are discussed in Calmus (1996b).…”
Section: Immobilized High-levei Wastementioning
confidence: 99%
“…Selection of an immobilized high-level waste (MLW) interim storage architecture to support Tank Waste Remediation System-Privatization (TWRS-P) Phase 1 was based on a thorough decision process (Calmus 1996a). Initially, several options for interim storage (Phase 1 and Phase 2) were evaluated to assess their technical viability; capital cost; schedule risk; environmental, safety, and health risk; and stakeholder confidence (Calmus 1996b).…”
Section: Introductionmentioning
confidence: 99%