2003
DOI: 10.1109/tpwrd.2002.803690
|View full text |Cite
|
Sign up to set email alerts
|

High-voltage onsite commissioning tests for gas-insulated substations using uhf partial discharge detection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2009
2009
2020
2020

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(6 citation statements)
references
References 1 publication
0
6
0
Order By: Relevance
“…PD signals are widely used in defect detection and on-site monitoring of GIS [16][17][18][19]. The primary purpose of the PD detection system in this paper was to capture the waveform of each PD signal with high temporal resolution and high sensitivity throughout the test to find out detailed information about the PD process.…”
Section: Daq System and Data Collection Methodsmentioning
confidence: 99%
“…PD signals are widely used in defect detection and on-site monitoring of GIS [16][17][18][19]. The primary purpose of the PD detection system in this paper was to capture the waveform of each PD signal with high temporal resolution and high sensitivity throughout the test to find out detailed information about the PD process.…”
Section: Daq System and Data Collection Methodsmentioning
confidence: 99%
“…This voltage is about 50% of power frequency withstand voltage (~680 kV) and may be inadequate to commission the equipment. Free-moving particles observed in service encounter low risks if their lengths are less than 3 mm [7].…”
Section: Description Of the Gitl Modelmentioning
confidence: 99%
“…(5)(6)(7) Being one of the important performance characteristics of the GIS, the reliability of its insulation is of great importance to the safety of power systems. As insulation failure usually starts with PD activity, which is usually accompanied by secondary phenomena such as sound, light, electromagnetic waves, temperature changes, and chemical reactions, (8)(9)(10)(11) hidden internal dangers can be detected by monitoring PD so that the reliability of the equipment can be ensured.…”
Section: Introductionmentioning
confidence: 99%