Day 2 Tue, February 13, 2024 2024
DOI: 10.2523/iptc-24327-ms
|View full text |Cite
|
Sign up to set email alerts
|

Historical Strategy Roadmap to Reduce the Operation Time for Drilling 8-1/2 Inch Production Hole Section in an Unconventional Drilling Operation

G. Yin,
D. A. Ramos,
J. P. Sinesi
et al.

Abstract: Historically, it was time consuming to drill an unconventional horizontal well with 7,000 ft horizontal length. The most time-consuming part of drilling operation was the production hole section. The drilling team made series of significant efforts to continuously perform various trials to seek the performance improvement. By revising the casing design, optimizing the bottom hole assembly (BHA) and bit, improving the drilling practices and enhancing the drilling parameters, a similar well can be delivered with… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?