Horizontal Lateral Drilling and Completion with Openhole Gravel Pack through a Unique TAML Level-4 Multilateral Junction System: The Installation Case Study from South China Sea

Abstract: A Technology Advancement of Multi-Laterals (TAML) level-4 completion was installed in the South China Sea in 2022. The unique design of this multilateral completion system increased efficiency and reliability in drilling and completing the well and enabled selective production from the main bore, the laterals, or both. It also incorporated a safe way of combining an openhole gravel pack job with a multilateral application. The main bore was completed with 9.625-in. casing. An 8.5-in. sidetrack w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 5 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?