2011
DOI: 10.3997/2214-4609.20145217
|View full text |Cite
|
Sign up to set email alerts
|

How Often Should you Acquire 4D Seismic Surveys to Optimise Value ?

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In the reservoir, a range of independent activities such as injector or producer well shut‐off or re‐start/start, alteration of a rate/choke setting, well tests, bumping/slugging and squeeze treatment (Watts and Marsh ) are known to cause reservoir pressure fluctuations. Pressure is also affected by turnaround, production optimization, workovers, evolving water cuts and the introduction of new wells or re‐introduction of old wells.…”
Section: Seismic Acquisition Versus Production Time‐scalesmentioning
confidence: 99%
“…In the reservoir, a range of independent activities such as injector or producer well shut‐off or re‐start/start, alteration of a rate/choke setting, well tests, bumping/slugging and squeeze treatment (Watts and Marsh ) are known to cause reservoir pressure fluctuations. Pressure is also affected by turnaround, production optimization, workovers, evolving water cuts and the introduction of new wells or re‐introduction of old wells.…”
Section: Seismic Acquisition Versus Production Time‐scalesmentioning
confidence: 99%