2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)
DOI: 10.1109/tdc.2001.971353
|View full text |Cite
|
Sign up to set email alerts
|

HTS cable system demonstration at Detroit Edison

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…During 1998-2003, a 120 meter demonstration cable circuit was designed and installed between the 24 kV distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. Impressively, the HTS cables in which copper was replaced with Ag-sheathed Bi 2 Ca 2 Sr 2 Cu 3 O x superconducting tapes wrapped around a flexible former were able to carry triple the power compared to the existing copper cables whilst weighing 30 % of the original weight [46,47]. Although the system incorporating cables, accessories, a refrigeration system and control instrumentation was never put in operation because of leaks in the cryostat, the project significantly advanced the state of the art in the design and implementation of HTS cable systems and proved to be enlightening for subsequent efforts in this engineering field.…”
Section: Hts Power Cablesmentioning
confidence: 99%
“…During 1998-2003, a 120 meter demonstration cable circuit was designed and installed between the 24 kV distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. Impressively, the HTS cables in which copper was replaced with Ag-sheathed Bi 2 Ca 2 Sr 2 Cu 3 O x superconducting tapes wrapped around a flexible former were able to carry triple the power compared to the existing copper cables whilst weighing 30 % of the original weight [46,47]. Although the system incorporating cables, accessories, a refrigeration system and control instrumentation was never put in operation because of leaks in the cryostat, the project significantly advanced the state of the art in the design and implementation of HTS cable systems and proved to be enlightening for subsequent efforts in this engineering field.…”
Section: Hts Power Cablesmentioning
confidence: 99%
“…The configuration of this base sub-model closely matches the existing Citipower's WMTS section of the network with zone substation loading obtained from the company's planning report [11]. In this sub-model, a 2011 load demand has been used to determine the overall load flow and identify stressed or exceeded rating elements in the network.…”
Section: Wmts 66kv Overhead Sub-modelmentioning
confidence: 99%