2008
DOI: 10.1016/j.epsr.2008.02.002
|View full text |Cite
|
Sign up to set email alerts
|

Hydrothermal self-scheduling problem in a day-ahead electricity market

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
35
0

Year Published

2010
2010
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 59 publications
(35 citation statements)
references
References 18 publications
0
35
0
Order By: Relevance
“…The water discharge limits are similar to those presented in [23]; however, in the proposed stochastic multiobjective HTSS model the spillage effect is also considered [2]. Also, the initial value of the reservoir, water balance [2], [23], and operating services [16] are considered in the proposed HTSS problem.…”
Section: The Other Constraints Of Hydro Unitsmentioning
confidence: 79%
See 3 more Smart Citations
“…The water discharge limits are similar to those presented in [23]; however, in the proposed stochastic multiobjective HTSS model the spillage effect is also considered [2]. Also, the initial value of the reservoir, water balance [2], [23], and operating services [16] are considered in the proposed HTSS problem.…”
Section: The Other Constraints Of Hydro Unitsmentioning
confidence: 79%
“…The other constraints of the proposed HTSS problem, as addressed in [2,34], are: time varying start-up cost function, Minimum Up-Time (MUT) and Minimum Down-Time (MDT), and Logical status of commitment. Also, the fuel limit constraints are taken from [7,16].…”
Section: E Other Constrains Of Thermal Unitsmentioning
confidence: 99%
See 2 more Smart Citations
“…Addition to the mentioned constraints, the other constraints of hydro units such as initial and final volume [17], Water balance [37] and operating services [38] are considered in the problem. Details of these constraints are given in mentioned references.…”
Section: C4 the Other Constraints Of Hydro Unitsmentioning
confidence: 99%