2021
DOI: 10.1061/(asce)me.1943-5479.0000943
|View full text |Cite
|
Sign up to set email alerts
|

Identification and Analysis of Factors Affecting the Future of Bridge Design, Construction, and Operation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 69 publications
0
3
0
Order By: Relevance
“…These data mostly come from different departments, which is the main reason for the low level of information sharing between systems, data isolation and management confusion, making it difficult for managers to fully grasp the bridge construction situation (Dayan et al., 2022). Therefore, it is necessary to effectively manage the various knowledge involved in bridge construction, to assist managers with a better understanding of problems and risks in the construction process, and to provide knowledge support for optimizing the adjustment of construction plans (Muhaimin et al., 2021). Currently, many scholars have carried out a series of related research on bridge construction knowledge management, mainly including construction knowledge management based on documents or GIS + BIM models (Kaewunruen et al., 2020).…”
Section: Related Researchmentioning
confidence: 99%
“…These data mostly come from different departments, which is the main reason for the low level of information sharing between systems, data isolation and management confusion, making it difficult for managers to fully grasp the bridge construction situation (Dayan et al., 2022). Therefore, it is necessary to effectively manage the various knowledge involved in bridge construction, to assist managers with a better understanding of problems and risks in the construction process, and to provide knowledge support for optimizing the adjustment of construction plans (Muhaimin et al., 2021). Currently, many scholars have carried out a series of related research on bridge construction knowledge management, mainly including construction knowledge management based on documents or GIS + BIM models (Kaewunruen et al., 2020).…”
Section: Related Researchmentioning
confidence: 99%
“…Pile was propelled by MENK hammers with 1,900, 2,400, and 3,500 kJ capabilities. The manufacture of the 262 piles required a total of 155,779 mt of steel plate (Muhaimin et al, 2021). Through the use of TAM nozzles, microfine cement grout was injected into the skin-grouted pile to fortify the surrounding soil.…”
Section: E Overcoming Geotechnical Challengesmentioning
confidence: 99%
“…The two-level bridge makes it possible to arrange utilities rationally, safely separate the highway from the railroad, and provide easy access for maintenance and inspection (Robin Sham, 2015). The bridge is also provided with emergency access points to facilitate safe and efficient evacuation from a train on the lower deck (Muhaimin et al, 2021). This study critically examined the sustainable management approaches that were applied to resolve the significant construction challenges encountered during the construction of the multipurpose bridge.…”
Section: Introductionmentioning
confidence: 99%