2022
DOI: 10.29322/ijsrp.12.11.2022.p13127
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of the Electricity Load Monitoring Trainer and Internet of Things-based Power Factor Improvement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
1
0
1
Order By: Relevance
“…Then this system is tested and its performance is measured both in terms of delay, server response, and the monitoring display of this system. This research aims to design, manufacture, control, and evaluate a prototype that can make a system able to control electrical loads and can monitor in real time [4] and can even be controlled remotely using the internet. [5]The method used is through the Analysis, Design, Development, Implementation, Evaluation (ADDIE) approach, namely by studying the literature [6] to analyze the research object, then design and develop the design results and implement the design results and then implement them on the research object [7][8], all suggestions for improvement are used as an evaluation for improving this system [9].…”
Section: Fig 1 Electrical Capacity Datamentioning
confidence: 99%
“…Then this system is tested and its performance is measured both in terms of delay, server response, and the monitoring display of this system. This research aims to design, manufacture, control, and evaluate a prototype that can make a system able to control electrical loads and can monitor in real time [4] and can even be controlled remotely using the internet. [5]The method used is through the Analysis, Design, Development, Implementation, Evaluation (ADDIE) approach, namely by studying the literature [6] to analyze the research object, then design and develop the design results and implement the design results and then implement them on the research object [7][8], all suggestions for improvement are used as an evaluation for improving this system [9].…”
Section: Fig 1 Electrical Capacity Datamentioning
confidence: 99%
“…Metode penelitian yang digunakan adalah dengan pendekatan ADDIE seperti pada Gambar 1 [33]. Metode ini merupakan metode yang banyak digunakan untuk menghasilkan suatu produk atau alat industri [17], [10].…”
Section: Metode Penelitianunclassified