2018
DOI: 10.1080/0305215x.2018.1485903
|View full text |Cite
|
Sign up to set email alerts
|

Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 22 publications
(6 citation statements)
references
References 46 publications
0
6
0
Order By: Relevance
“…Maintenance is scheduled according to the conservative criterion as mentioned in Section 4.1.4 . Jabbarizadeh et al (2009) , Naderi et al (2009b) , Naderi et al (2011) and Miyata et al (2019b) extend the work of and adopt similar policies and approaches in their work. Wang & Liu (2014) , Khatami & Zegordi (2017) and Seidgar et al (2016) adopt the maintenance scheduling policy proposed by Berrichi et al (2009) , where instead of maximizing the machine availability, the whole system availability is considered.…”
Section: Scheduling With a Pm Policymentioning
confidence: 94%
See 2 more Smart Citations
“…Maintenance is scheduled according to the conservative criterion as mentioned in Section 4.1.4 . Jabbarizadeh et al (2009) , Naderi et al (2009b) , Naderi et al (2011) and Miyata et al (2019b) extend the work of and adopt similar policies and approaches in their work. Wang & Liu (2014) , Khatami & Zegordi (2017) and Seidgar et al (2016) adopt the maintenance scheduling policy proposed by Berrichi et al (2009) , where instead of maximizing the machine availability, the whole system availability is considered.…”
Section: Scheduling With a Pm Policymentioning
confidence: 94%
“…In the work of ) , Jabbarizadeh, Zandieh, & Talebi (2009 , Naderi, Zandieh, & Fatemi Ghomi (2009b) , Naderi, Zandieh, & Aminnayeri (2011) , Miyata, Nagano, & Gupta (2019b , Wang & Liu (2014) , Khatami & Zegordi (2017) and Seidgar, Zandieh, & Mahdavi (2016) , maintenance is scheduled according to a policy. The study by is the first to introduce the scheduling problem where the interval of the maintenance activities is determined preparatory to scheduling the jobs.…”
Section: Scheduling With a Pm Policymentioning
confidence: 99%
See 1 more Smart Citation
“…Chansombat et al (2019) proposed a mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. Miyata et al (2019a) incorporated preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization. Miyata et al (2019b) incorporated preventive maintenance operations as a constraint to the m-machine no-wait flow shop problem with dependent-sequence setup times and makespan minimization scheduling problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…However, the new modeling technique and an enumeration algorithm are proposed to address the NWFSSP with the makespan criterion and due date constraints, which can shrink the feasible region and enhance the search speed. 5 The heuristics and constructive 1 School of Mechanical and Electrical Engineering, Henan Institute of Science and Technology, Xinxiang, China heuristics [6][7][8] are proposed to resolve the NWFSSP with makespan or total flow-time minimization criterion. In addition, to solve the NWFSSP with large size, a jigsaw puzzle-inspired algorithm is presented.…”
Section: Introductionmentioning
confidence: 99%