Industrializing precast productions

Abstract: Building in heavy rain is seldom beneficial, but common practice on site. It promotes inaccuracies and impairs the use of modern but sensible high‐performance materials and costs time, since disruption in construction frequently causes complicated returns to the planning process. Nevertheless, a handcrafted production process is still considered the one and only alternative since all buildings are unique and thus must be manually constructed on site. Indeed? The priority program entitled “Adaptive modularized … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0
3

Year Published

2022
2022
2023
2023

Publication Types

Select...
6
1

Relationship

5
2

Authors

Journals

citations
Cited by 18 publications
(10 citation statements)
references
References 38 publications
0
7
0
3
Order By: Relevance
“…Diese Verschwendung von Material, Zeit und humanitärer Arbeitskraft sollte vermieden werden [3]. Ein Lösungsansatz ist die Modulbauweise, in der Tragwerke in viele gleiche (oder ähnliche) Betonbauteile (Module) segmentiert werden, die in serieller Fertigung adaptiv, qualitätsgesichert und automatisiert vorgefertigt werden [4][5][6][7]. Sie können zudem formoptimiert [8] und somit ressourceneffizient [9,10] produziert und auf der Baustelle nur noch montiert wer-den.…”
Section: Fertigungstoleranzen Von Betonfertigteilen Für Die Modulare ...unclassified
“…Diese Verschwendung von Material, Zeit und humanitärer Arbeitskraft sollte vermieden werden [3]. Ein Lösungsansatz ist die Modulbauweise, in der Tragwerke in viele gleiche (oder ähnliche) Betonbauteile (Module) segmentiert werden, die in serieller Fertigung adaptiv, qualitätsgesichert und automatisiert vorgefertigt werden [4][5][6][7]. Sie können zudem formoptimiert [8] und somit ressourceneffizient [9,10] produziert und auf der Baustelle nur noch montiert wer-den.…”
Section: Fertigungstoleranzen Von Betonfertigteilen Für Die Modulare ...unclassified
“…The threaded rod at the top ( 5) is clamped in the hydraulic jaws of the testing From there, the load is transferred in a trusslike manner via two 10 mm thick plates (3) or one 20 mm thick plate (4), respectively. These plates transfer the load evenly to two lateral threaded rods (1) and into clamping plates (2). By friction, the force is then introduced into the test specimen (7) clamped with four threaded rods (6).…”
Section: Assembly and Measurement Instrumentationmentioning
confidence: 99%
“…New construction processes are needed to meet these demands. A decisive step in this direction can be the quality‐robust series prefabrication of reinforced concrete components 1,2 . However, the cost of placing reinforcement remains high.…”
Section: Introductionmentioning
confidence: 99%
“…For modular construction mostly two design avenues are applied: bottom-up and top-down. 5,6 While bottom-up is using available segments to build up an entire structure or building, top-down is mostly referring to the split of the structure in smaller modules. Those may be repetitive or unique.…”
Section: Introductionmentioning
confidence: 99%