2023
DOI: 10.1587/comex.2023xbl0064
|View full text |Cite
|
Sign up to set email alerts
|

Influence of cable length between TLP test system and DUT and its correction for CMCESD saturation measurement

Abstract: Focusing on the TLP (transmission line pulse) method used for ESD (electrostatic discharge) saturation measurement described in IEC 62228-5 Annex E, we investigated the validity of its measurement conditions. Since there is no provision for the cable length between a TLP test system and a device under test, we investigated the influence of the cable length on the ESD saturation measurement. The result shows that different voltage and current waveforms in the measurement time window, i.e., different I/V charact… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 4 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?