Proceedings Particle Accelerator Conference
DOI: 10.1109/pac.1995.505588
|View full text |Cite
|
Sign up to set email alerts
|

Initial diagnostics commissioning results for the Advanced Photon Source (APS)

Abstract: Principal diagnostics systems have been installed and nearly all have been commissioned on the subsystems of the Advanced Photon Source (APS) facility. Data have been obtained on beam position, beam profile, current, beam loss rate, and synchrotron radiation monitors on both injector rings and most recently the main 7-GeV storage ring. Results for the 150-to 450-MeV electron beams in the accumulator ring, up to 7 GeV in the injector synchrotron, and 4.5 to 7 GeV in the SR will be presented.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…The commissioning of the Advanced Photon Source ( A P S ) 7-GeV storage ring (SR) was supported by a full complement of diagnostics subsystems (1)(2)(3). Both the machine and, in some cases, specific features of the diagnostics systems were evaluated and demonstrated in a phased manner.…”
Section: Introductionmentioning
confidence: 99%
“…The commissioning of the Advanced Photon Source ( A P S ) 7-GeV storage ring (SR) was supported by a full complement of diagnostics subsystems (1)(2)(3). Both the machine and, in some cases, specific features of the diagnostics systems were evaluated and demonstrated in a phased manner.…”
Section: Introductionmentioning
confidence: 99%