Innovative contract and compensation model in mechanised tunnelling – Calculation of the deviating construction time based on digital excavation and process data

Abstract: The handling of a tunnel construction project poses great challenges for all those involved. Variables that cannot be clearly quantified can arise during the entire process of the project. The subsoil in tunnelling is one of these parameters which is difficult to forecast. The geological and hydrogeological conditions must be assessed during the planning phase with the help of exploratory measures and from the experience from projects that have already been built.During the execution work, deviations from the … Show more