SPE Asia Pacific Oil and Gas Conference and Exhibition 2008
DOI: 10.2118/114803-ms
|View full text |Cite
|
Sign up to set email alerts
|

Innovative Well Operations from a DPII Vessel: A Case Study

Abstract: The traditional need to carry out all well operations from a rig can be expensive and delays valuable well construction programmes. Rigless intervention, including the use of subsea wireline lubricators and installing subsea Xmas trees on wire, utilising a Dynamically Positioned (DP) intervention vessel has long been accepted in some areas of the world as a costeffective and efficient alternative to traditional rig-based methods.In 2005 it was recognised internally that the ability to intervene without a tradi… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles