2016
DOI: 10.1155/2016/5720565
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Analysis of the Formation Mechanism of Cracks in a Concrete Dam Using Microseismic Monitoring and Numerical Simulation

Abstract: The dam of Guanyinyan hydropower station is composed of a concrete gravity dam in the left bank and a rockfill dam in the right bank. During the operation of the hydropower station, several surface cracks occurred in the concrete gravity dam, which threatened the stability of the dam. To evaluate the evolution trend of the cracks and forecast the potential risk of the dam, the microseismic (MS) monitoring technique and finite-element method were used. First, the concrete three-point bending field test was perf… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 24 publications
(30 reference statements)
0
0
0
Order By: Relevance