1996
DOI: 10.1080/00908319608908789
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Gasification Combined Cycle— A Review of IGCC Technology

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
24
0

Year Published

2006
2006
2015
2015

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 46 publications
(24 citation statements)
references
References 15 publications
0
24
0
Order By: Relevance
“…The fuel gas from a gasifier comes out at 1000-2600 • F [19]. This gas is treated for removal of particulate matter and hydrogen sulfide.…”
Section: Pre-combustion Capturementioning
confidence: 99%
See 1 more Smart Citation
“…The fuel gas from a gasifier comes out at 1000-2600 • F [19]. This gas is treated for removal of particulate matter and hydrogen sulfide.…”
Section: Pre-combustion Capturementioning
confidence: 99%
“…This gas is treated for removal of particulate matter and hydrogen sulfide. This gas clean up involves cooling (cold gas cleanup at 311 K) or no cooling (hot gas cleanup at 810 K) [19,20]. The gas cooler produces steam which is utilized by steam turbine to generate electricity.…”
Section: Pre-combustion Capturementioning
confidence: 99%
“…Such information will be useful in the consideration for hydrate crystallization as a potential CO 2 /H 2 separation process [16,17]. Moreover, it is of interest to study the formation of hydrates from CO 2 and H 2 in the presence of a third component that will decrease the hydrate formation pressure.…”
Section: Introductionmentioning
confidence: 99%
“…A schematic representation illustrating one of many possible phased-construction scenarios for an IGCC plant is presented in Figure 8. (Joshi et al 1996) The simple scheme in Figure 8 is based in two gas turbines. In the first phase, a single gas turbine is installed, to be fired by natural gas.…”
Section: Advantagesmentioning
confidence: 99%
“…In the fourth and final phase, a coal gasification plant is constructed and the entire facility is operated as a coal-fired IGCC power plant. (Joshi et al 1996).…”
Section: Advantagesmentioning