2017
DOI: 10.1016/j.jclepro.2017.01.166
|View full text |Cite
|
Sign up to set email alerts
|

Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
25
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 77 publications
(26 citation statements)
references
References 52 publications
1
25
0
Order By: Relevance
“…However, since the integrated optimization of the flexible job shop scheduling problem can reduce conflicts of resources, the two-stage optimization technique in their research may not be the best optimization scheme. Giglio et al [45] solved an integrated lot sizing and energy-efficient job shop scheduling problem using a relax-and-fix heuristic algorithm; they show that their method can reduce energy consumption, machines idle times, and the overall cost of the system. Some researchers also considered the optimal scheduling method with time-sharing prices [46,47]; however, that belongs to another topic where only the time period with low electric charge is considered, and this goes out of the scope of this research.…”
Section: Literature Reviewmentioning
confidence: 99%
“…However, since the integrated optimization of the flexible job shop scheduling problem can reduce conflicts of resources, the two-stage optimization technique in their research may not be the best optimization scheme. Giglio et al [45] solved an integrated lot sizing and energy-efficient job shop scheduling problem using a relax-and-fix heuristic algorithm; they show that their method can reduce energy consumption, machines idle times, and the overall cost of the system. Some researchers also considered the optimal scheduling method with time-sharing prices [46,47]; however, that belongs to another topic where only the time period with low electric charge is considered, and this goes out of the scope of this research.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For example, batching has been considered in a job-shop scheduling problem (JSP) [4,24], flow-shop scheduling problem (FSP) [25,26], and parallel machine scheduling problem [27]. Research on production scheduling problems considering batch splitting has mainly focused on JSP and FSP.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Giglio et al [8] presented a paper that solves the job scheduling problem by using a relax-and-fit heuristics approach. Quariguasi-Frota-Neto and Bloemhof [9] compared the eco-efficiency of the remanufactured computer and mobile phones to their new counterparts.…”
Section: Remanufacturingmentioning
confidence: 99%