1989
DOI: 10.2172/6212705
|View full text |Cite
|
Sign up to set email alerts
|

Integrated reservoir assessment and characterization: Final report, October 1, 1985--September 30, 1988

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

1994
1994
2023
2023

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Because the methodology of reservoir characterization is complex, multidisciplinary, and reiterative, and because the methodology is not widely practiced or understood throughout the industry, it 'is a prime candidate for technology transfer by a computer-based or expert system approach. Honarpour et al (1989) describe a simple deterministic system developed to advise users how to properly collect geoscience and engineering data for building a reservoir characterization model. More complete coverage of the various facets of reservoir characterization methodologies by such tools would be helpful to Class 4 operators seeking to define their reservoir characterization needs.…”
Section: Comprehensive Methodologiesmentioning
confidence: 99%
See 1 more Smart Citation
“…Because the methodology of reservoir characterization is complex, multidisciplinary, and reiterative, and because the methodology is not widely practiced or understood throughout the industry, it 'is a prime candidate for technology transfer by a computer-based or expert system approach. Honarpour et al (1989) describe a simple deterministic system developed to advise users how to properly collect geoscience and engineering data for building a reservoir characterization model. More complete coverage of the various facets of reservoir characterization methodologies by such tools would be helpful to Class 4 operators seeking to define their reservoir characterization needs.…”
Section: Comprehensive Methodologiesmentioning
confidence: 99%
“…Other oil and gas production data such as cumulative or current production, gas-oil ratios, etc., when mapped, can give useful information about reservoir characteristics if man-induced effects are properly considered. Honarpour et al (1989) by reviewing water-cut production data. Honarpour and Tomutsa (1990) confumed the presence of geologically inferred faults and, by comparing actual waterflood front advancement with simulations assuming various positions and transmissibilities of faults, determined the sealing versus nonsealing nature of those faults.…”
Section: Producriondatamentioning
confidence: 99%
“…Asecond Uninood" micellar-polymer project was started in 1981 in Bell Creek Unit A. Project location was about 3.5 miles south of the first pilot in an area that geological and engineering investigation had established as being more homogeneous (Honarpour et al, 1989). Results were more favorable, and cumulative tertiary oil production from the 179-acre project area was 1.37 million barrels of oil throughAugust 1987.…”
Section: Bell Creekmentioning
confidence: 99%
“…An extensive, integrated geological and engineering analysis of the Bell Creek Unit A p h a r y , secondary, and tertiary production from the two tertiary pilots was supported by the DOE (Sharma et al, 1990;Honarpour et al, 1989;Jackson et al, 1991;Cheng and Sharma, 1991). Besides demonstrating integrated reservoir management techniques, this work defined the mechanisms that control production in Bell Creek Unit A.…”
Section: Bell Creekmentioning
confidence: 99%