2014
DOI: 10.1080/00207543.2014.958595
|View full text |Cite
|
Sign up to set email alerts
|

Integrated scheduling and self-reconfiguration for assembly job shop in knowledgeable manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 39 publications
0
5
0
Order By: Relevance
“…An ideal schedule of products A and F is constructed firstly 4 : all products are completed exactly at their ideal completion time (the sum of times of operations on critical path), each operation completed exactly at their own successor starts, as shown in Figure 2.…”
Section: Heuristic Algorithmmentioning
confidence: 99%
See 3 more Smart Citations
“…An ideal schedule of products A and F is constructed firstly 4 : all products are completed exactly at their ideal completion time (the sum of times of operations on critical path), each operation completed exactly at their own successor starts, as shown in Figure 2.…”
Section: Heuristic Algorithmmentioning
confidence: 99%
“…Then, an initial schedule can be obtained. Detailed steps of the locally optimal sequence procedure are analogous to those of the algorithm proposed by Wan and Yan, 4 so it is not repeated here.…”
Section: Heuristic Algorithmmentioning
confidence: 99%
See 2 more Smart Citations
“…Various achievements have been made in recent studies that have focused on KMSs. Wan and Yan 9 proposed a heuristic algorithm for integrated assembly job shop scheduling and self-reconfiguration in knowledgeable manufacturing. Yan et al 10 proposed a hybrid variable neighborhood search electromagnetism-like mechanism algorithm to overcome the two-stage assembly flow shop scheduling problem.…”
Section: Introductionmentioning
confidence: 99%