2022
DOI: 10.1007/s40747-022-00875-7
|View full text |Cite
|
Sign up to set email alerts
|

Integrated scheduling of distributed production and distribution in group manufacturing with uncertain travel time

Abstract: This paper presents a novel integrated distributed production and distribution scheduling problem in group manufacturing with uncertain travel time (IDPDSP-GM-UTT), in which products are firstly produced in several distributed hybrid flow shops and then delivered to several retailers in batches. The proposed model considers both geographical dispersion of multi-factories and variable travel time between factories and retailers caused by time-varying dynamics of road network, which describes the production envi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 36 publications
0
0
0
Order By: Relevance