2009
DOI: 10.1108/09699980910970851
|View full text |Cite
|
Sign up to set email alerts
|

Integrating numerical tools in underground construction process

Abstract: /npsi/ctrl?lang=en http://nparc.cisti-icist.nrc-cnrc.gc.ca/npsi/ctrl?lang=fr Access and use of this website and the material on it are subject to the Terms and Conditions set forth at http://nparc.cisti-icist.nrc-cnrc.gc.ca/npsi/jsp/nparc_cp.jsp?lang=en NRC Publications Archive Archives des publications du CNRCThis publication could be one of several versions: author's original, accepted manuscript or the publisher's version. / La version de cette publication peut être l'une des suivantes : la version prépubli… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
8
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(9 citation statements)
references
References 19 publications
1
8
0
Order By: Relevance
“…This seems a reasonable argument for most construction projects as was explained before introducing expression (2) and seems to be aligned with empirical results (e.g. [52,53]). However, if the risk increased by a power other than unity, the maximum compression achievable would have been different to 25%.…”
Section: Discussionsupporting
confidence: 85%
See 3 more Smart Citations
“…This seems a reasonable argument for most construction projects as was explained before introducing expression (2) and seems to be aligned with empirical results (e.g. [52,53]). However, if the risk increased by a power other than unity, the maximum compression achievable would have been different to 25%.…”
Section: Discussionsupporting
confidence: 85%
“…Project fast-tracking is increasingly being applied in the construction industry, as there is an increased demand for the expedient delivery of construction projects [53]. Unsuccessful coordination will eventually lead to project cost and/or time overruns.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Kim, Lee, Kim, Koo, Jung, and Seo [15] and Jung, Kim, Lee, Hwang, and Seo [16] proposed a new conceptual construction process involving floating methods for expanding existing buildings and conceptually arranged the process for selecting the most suitable method among various construction methods according to characteristics of each site. Selection processes for appropriate construction techniques can influence both the time and costs of construction, as well as the environment [17].…”
Section: Introductionmentioning
confidence: 99%