Proceedings of SPE Annual Technical Conference and Exhibition 1993
DOI: 10.2523/26499-ms
|View full text |Cite
|
Sign up to set email alerts
|

Integration of a Geological-Engineering Model With Production Performance: A Case Study at Patrick Draw Field, Wyoming

Abstract: Analysis of production performance data from the Almond Formation in Patrick Draw Field, WY, a mesotidal shoreline barrier reservoir, was integrated with geological, geophysical, hydrogeochemical, and engineering information to generate an integrated reservoir model. 2

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?