Digitale Baustelle- Innovativer Planen, Effizienter Ausführen 2011
DOI: 10.1007/978-3-642-16486-6_2
|View full text |Cite
|
Sign up to set email alerts
|

Integrierte Planung auf Basis von 3D-Modellen

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…In many cases, each organization designs its part separately, and there is no data transfer to other design areas. Therefore, if it is necessary to exchange information, engineers are faced with reconstructing the system, which requires a certain interpretation of geometric and semantic information [13].…”
Section: Introductionmentioning
confidence: 99%
“…In many cases, each organization designs its part separately, and there is no data transfer to other design areas. Therefore, if it is necessary to exchange information, engineers are faced with reconstructing the system, which requires a certain interpretation of geometric and semantic information [13].…”
Section: Introductionmentioning
confidence: 99%