2015
DOI: 10.1016/j.cie.2014.12.033
|View full text |Cite
|
Sign up to set email alerts
|

Intelligent engineering asset management system for power transformer maintenance decision supports under various operating conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
48
0
4

Year Published

2015
2015
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 77 publications
(53 citation statements)
references
References 29 publications
1
48
0
4
Order By: Relevance
“…The planned corrective maintenance is a technique that ensures a reduction in costs and duration of the repair. For this reason, classification algorithms [11] or neural networks [15] [16] have been applied to address problems of ice accumulation [18] [10] as well as the prediction of physical deterioration of machinery (generators and transformers) [20] [12]. Next, (ii) preventive maintenance consists of reducing equipment failures by seeking solutions to problems before they happen.…”
Section: Related Workmentioning
confidence: 99%
“…The planned corrective maintenance is a technique that ensures a reduction in costs and duration of the repair. For this reason, classification algorithms [11] or neural networks [15] [16] have been applied to address problems of ice accumulation [18] [10] as well as the prediction of physical deterioration of machinery (generators and transformers) [20] [12]. Next, (ii) preventive maintenance consists of reducing equipment failures by seeking solutions to problems before they happen.…”
Section: Related Workmentioning
confidence: 99%
“…The BP algorithm is motivated to minimize the sum-squared error following the gradient descent approach [16,17].…”
Section: The Ann Modelmentioning
confidence: 99%
“…Furthermore, several soft computing techniques have also been used in various studies to overcome the shortcomings of the different standard methods. Some of the popular soft computing methods that have been adopted to improve the reliability of DGA-based transformer incipient fault identification are fuzzy logic [11][12][13][14], ANNs [15][16][17], wavelet networks [18,19] and the adaptive neuro-fuzzy inference system (ANFIS) [20][21][22][23]. However, these intelligent techniques have their own limitations and hence the degree of the reliability of the method would depend on how these methods are adopted to circumvent their limitations.…”
Section: Introductionmentioning
confidence: 99%
“…Power grid construction concerns people's social life and national energy security, which plays an important role in promoting economic development, pushing industrial structure upgrades, and optimizing resource allocation [1,2]. The power grid interconnection project holds the characteristics of long construction period, intensive technical and economic investments, and wide covering range, the construction of which can be influenced by the external environment factors [3,4].…”
Section: Introductionmentioning
confidence: 99%