2018 IEEE 3rd International Conference on Intelligent Energy and Power Systems (IEPS) 2018
DOI: 10.1109/ieps.2018.8559487
|View full text |Cite
|
Sign up to set email alerts
|

Intelligent Locomotive Decision Support System Structure Development and Operation Quality Assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 14 publications
(5 citation statements)
references
References 5 publications
0
4
0
1
Order By: Relevance
“…The proposed information system for monitoring cargo vehicles [38][39][40][41][42][43][44][45] has a number of features. The main thing is that it is able to perform the DWRR check during the determination of the parameters of the technical condition of the cargo vehicle with the help of a modern on-board information and communication system.…”
Section: Discussion Of Results Of Implementing the Informationanalyti...mentioning
confidence: 99%
“…The proposed information system for monitoring cargo vehicles [38][39][40][41][42][43][44][45] has a number of features. The main thing is that it is able to perform the DWRR check during the determination of the parameters of the technical condition of the cargo vehicle with the help of a modern on-board information and communication system.…”
Section: Discussion Of Results Of Implementing the Informationanalyti...mentioning
confidence: 99%
“…[1,[13][14][15][16][17][18][19]]. The tasks listed and similar to them are still mainly solved by outdated methods that no longer provide the required quality, rational approach and efficiency [20][21][22]. Evaluation of operating conditions and analysis of road plans and profiles are usually performed manually; updates of maps and diagrams are extremely rare; data on the state of most objects are not systematized and thus difficult to access.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…As practice shows, the time that it takes for a train to travel a railroad section does not coincide with the planned duration, regulated by the timetable of trains. According to research [18,19], the railroad systems, specifically AT "Ukrzaliznytsya", where the principle of traffic is based on dispatching freight trains "when ready" without observing the schedule of regulatory timetable of trains, are characterized by considerable uncertainty. Thus, there is a deviation of the actual time of traffic from the planned one that reaches 20-40 %.…”
Section: Studying the Macrocharacteristics Of Train Flows Traffic mentioning
confidence: 99%