2022
DOI: 10.1049/icp.2021.2634
|View full text |Cite
|
Sign up to set email alerts
|

Interfacing energy management with supervisory control for hybrid power plants

Abstract: Variability and uncertainties of wind and solar bring significant challenges into power system operation and control. Hybrid power plants (HPPs), which incorporates the complementary nature of wind and solar together with other technologies, such as energy storage, is a solution to cope with these challenges. To maximize the revenue and enable the operation of HPPs, the energy management system and the supervisory controller are both needed, namely the HPP EMS and the HPPC. The HPP EMS provides optimal dispatc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(10 citation statements)
references
References 11 publications
0
10
0
Order By: Relevance
“…The HPP controller, along with plant controllers, executes the decision of the HPP EMS at best effort. The preliminary results showing the interactions between the HPP EMS and the HPP controller could be found in [38]. The long-term performance considering a complete EMS design under the proposed control architecture will be considered in the follow-up study.…”
Section: (2d)mentioning
confidence: 99%
See 2 more Smart Citations
“…The HPP controller, along with plant controllers, executes the decision of the HPP EMS at best effort. The preliminary results showing the interactions between the HPP EMS and the HPP controller could be found in [38]. The long-term performance considering a complete EMS design under the proposed control architecture will be considered in the follow-up study.…”
Section: (2d)mentioning
confidence: 99%
“…In terms of update rate for these variables, there is no need to update them more frequently than every EMS time step. However, too infrequent update for 𝐸 𝐸𝑆𝑆 could cause sub-optimal bidding plans of the HPP EMS and a sub-optimal operation of the HPP [38].…”
Section: Active Power Controlmentioning
confidence: 99%
See 1 more Smart Citation
“…2. An overview of HPP EMS and HPP PMS [31] activated regulation power multiplied by the up price or down price according to the sign of the delta (32).…”
Section: Post-calculation Of Revenue and Costmentioning
confidence: 99%
“…The interface of EMS with PMS is shown in Fig. 2 [31], where the EMS provides energy set-points to PMS and obtains real-time measurement values, e.g. P rt k from PMS.…”
Section: E Real-time Measurementsmentioning
confidence: 99%