2018
DOI: 10.1088/1742-6596/1065/5/052016
|View full text |Cite
|
Sign up to set email alerts
|

Introduction and progress in the EMPIR project TracePQM: Traceability Routes for Electric Power Quality Measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…First, the measurement of the total loss of the Epstein sample was cross-validated using the measurement software and the TracePQM WattMeter (TWM) using two 3458A-type multimeters. TWM was developed as part of the TracePQM project [8]. The power value P measured by TWM (using the TWM-PWRTDI time domain integration method) was then divided by the effective mass ma of the Epstein sample to obtain the specific total loss value Ps…”
Section: Validationmentioning
confidence: 99%
“…First, the measurement of the total loss of the Epstein sample was cross-validated using the measurement software and the TracePQM WattMeter (TWM) using two 3458A-type multimeters. TWM was developed as part of the TracePQM project [8]. The power value P measured by TWM (using the TWM-PWRTDI time domain integration method) was then divided by the effective mass ma of the Epstein sample to obtain the specific total loss value Ps…”
Section: Validationmentioning
confidence: 99%