2014
DOI: 10.1007/s10845-014-0875-x
|View full text |Cite
|
Sign up to set email alerts
|

Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
14
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
8
1
1

Relationship

1
9

Authors

Journals

citations
Cited by 33 publications
(14 citation statements)
references
References 36 publications
0
14
0
Order By: Relevance
“…Zeng et al. () studied the problem of parts scheduling in job shop cells by minimizing the makespan and proposed a mathematical model for these test problems. They used a neighborhood based on the disjunctive graph model to guarantee the efficiency of the proposed algorithm.…”
Section: Introductionmentioning
confidence: 99%
“…Zeng et al. () studied the problem of parts scheduling in job shop cells by minimizing the makespan and proposed a mathematical model for these test problems. They used a neighborhood based on the disjunctive graph model to guarantee the efficiency of the proposed algorithm.…”
Section: Introductionmentioning
confidence: 99%
“…However, the different scheduling rules produce different performances or complexity of a system (Chuen and Robert 1993 ; Grabot and Geneste 1994 ; Holthaus and Rajendran 1997 ; Amirghasemi and Zamani 2014 ; Nurre and Sharkey 2014 ; Xu et al 2015 ; Zeng et al 2015 ). The comparative analysis of scheduling rules in some specific industrial environments can be found in Rajendran and Holthaus ( 1999 ), Kizil et al ( 2006 ), Chiang and Fu ( 2007 ), Akturk ( 2011 ), and Li et al ( 2015 ).…”
Section: Influence Of the Scheduling Rules On Line- Seru mentioning
confidence: 99%
“…Cell scheduling can be divided into cell internal scheduling and scheduling between multiple cells [3], the problem of internal scheduling has been studied by quite a few scholars. Mak et al [4] studied the dynamic scheduling problem of parts in Virtual Manufacturing Cell under multi -period of determining demand.…”
Section: Introductionmentioning
confidence: 99%