1990
DOI: 10.1080/10519999008225528
|View full text |Cite
|
Sign up to set email alerts
|

JT-60 upgrade device for confinement and steady state studies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
11
0

Year Published

1991
1991
2004
2004

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 57 publications
(11 citation statements)
references
References 9 publications
0
11
0
Order By: Relevance
“…After the construction of JT-60U in 1990-1991 [4,5], deuterium experiments have begun at July 1991. In 1997, the divertor structure inside the vacuum vessel was modified from an open divertor to a W-shaped divertor with pumping to study high-performance plasmas and steady-state operation [6].…”
Section: Methodsmentioning
confidence: 99%
“…After the construction of JT-60U in 1990-1991 [4,5], deuterium experiments have begun at July 1991. In 1997, the divertor structure inside the vacuum vessel was modified from an open divertor to a W-shaped divertor with pumping to study high-performance plasmas and steady-state operation [6].…”
Section: Methodsmentioning
confidence: 99%
“…The pumping speed achieved was about 800 m3/s. (7) The JT-60 NB system is now under modifications to raise the beam energy up to 120 keV and to convert into deuterium beams system for the JT-60 upgrade [14].…”
Section: Discussionmentioning
confidence: 99%
“…5 (b). This parallel computing method has been applied to a large scale electromagnetic-mechanical coupled analysis of JT-6OU [9] vacuum vessel in a state of plasma disruption. Current quench time of 10 ms for 6 MA plasma current and the steady toroidal field of 4.2 T are assumed for the analysis, which are the same as the design condition.…”
Section: A Estimation Of Parallel Execution Timementioning
confidence: 99%