The 2nd International Research Conference on Sustainable Energy, Engineering, Materials and Environment 2018
DOI: 10.3390/proceedings2231429
|View full text |Cite
|
Sign up to set email alerts
|

Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia)

Abstract: In the framework of the largest urban-transit system ever built from scratch, the Riyadh Metro Project (6 lines totaling 176 km), a comprehensive investigation was carried out for karst detection, prevention and correction. This case study of the Metro Line 3 (41.6 km) seeks to show how the multi-technique geophysical survey (seismic refraction, electrical resistivity and ground penetration radar down to 40–50 m depth) was found to be a successful tool in detecting karst features. Preventive measures included … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
references
References 5 publications
0
0
0
Order By: Relevance