Abstract:Land mobile communications dates back to the 1920s; and it has served well, although comparatively inconspicuously, ever since. In that period, the majority of land mobile systems were used for public safety and vehicle dispatching. Only since the mid‐1980s have land mobile systems started to really take their place in the business community. Cellular radio began the explosive march. The kickoff event was a description of an analog FM system called AMPS (advanced mobile phone system) in a 1979 issue of Bell Sy… Show more
“…(50) Freeman (62) has connected the gallbladder directly to the urinary bladder by means of a plastic conduit. With all these methods, the bile i s diverted into the urinary system after ligation of the common duct.…”
“…(50) Freeman (62) has connected the gallbladder directly to the urinary bladder by means of a plastic conduit. With all these methods, the bile i s diverted into the urinary system after ligation of the common duct.…”
“…There is no practical difference between bidding unavailable and bidding as a price taker, except constantly bidding zero into PJM may trigger a review by the PJM market monitor. To avoid this, PJM has instructed some of the intermittent renewable energy generators to bid unavailable into PJM (Freeman 2002). As with the price taker option, the intermittent generator cannot set the prevailing market price in PJM-it can only take the prevailing market price.…”
Section: Bid Into Pjm Energy Market As a Price Takermentioning
confidence: 99%
“…PJM has 199 members as of April 2002(PJM 2002b. To become a member, an entity must comply with the PJM operating agreement and be a transmission owner within the PJM control area or an eligible customer under the PJM tariff; a generation owner, supplier, electric distributor, or end-user customer; or an entity that will buy, sell or transmit electric power in or through the PJM.…”
Section: Appendix A: Ferc's Required Rto Characteristics and Functionmentioning
confidence: 99%
“…Intermittent renewable generators that bid unavailable or bid into PJM as a price taker will not have to balance their real-time deliveries with their advance schedules, but will have to pay real-time operating reserve costs if the energy that is delivered exceeds 5 MW. Real-time operating reserve costs generally cost about $0.50/MWh over an entire year (Freeman 2002).…”
mentioning
confidence: 99%
“…The wind plants are designated as unavailable and output from the two wind projects is sold into the PJM real-time energy market, while "green tags" representing the environmental attributes of wind energy are sold to customers (Freeman 2002). Wind energy currently is a very small percentage of available resources in PJM, but it is likely that PJM will want wind energy generators to use a different market strategy than being unavailable if a significant amount of wind becomes operational in PJM.…”
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.