2017
DOI: 10.1016/j.ssci.2016.08.020
|View full text |Cite
|
Sign up to set email alerts
|

Leading or lagging? Temporal analysis of safety indicators on a large infrastructure construction project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
70
0
2

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 129 publications
(74 citation statements)
references
References 32 publications
2
70
0
2
Order By: Relevance
“…The followed articles focused on progressing the indicators such as [22]- [28]. Only a few articles concentrated on the second step which is the testing on construction projects through completion of validation testing of the leading on the lagging indicators [1], [29].…”
Section: Methodology Of the Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…The followed articles focused on progressing the indicators such as [22]- [28]. Only a few articles concentrated on the second step which is the testing on construction projects through completion of validation testing of the leading on the lagging indicators [1], [29].…”
Section: Methodology Of the Literature Reviewmentioning
confidence: 99%
“…In [1] used a scoring system where opinions were subtracted depended on the number of safety violations that happened on the site. Site checks are checklists prepared by some familiar individuals such as a supervisor or safety representative [29].…”
Section: Summary Of Leading Indicatorsmentioning
confidence: 99%
See 2 more Smart Citations
“…These indicators are the most common that are used in the industry because they are clear and easy to be identified and measured. They are used to measure the safety events that already occurred including accidents, explosions, fires, and flammable or toxic material releases [28,29] . Therefore, this study has suggested a safety performance framework (SPF) incorporated with the identification of leading and lagging metrics for all the fourteen elements of PSM.…”
Section: Introductionmentioning
confidence: 99%