2019
DOI: 10.1016/j.autcon.2018.12.017
|View full text |Cite
|
Sign up to set email alerts
|

Lean production theory-based simulation of modular construction processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
85
1
8

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 153 publications
(94 citation statements)
references
References 35 publications
0
85
1
8
Order By: Relevance
“…To identify PBP documents, a wide range of keywords were used to search for those related to PB, including industrialized building (Zabihi et al, 2013), off-site construction (Arashpour et al, 2015), prefabricated construction/building (Tan et al, 2019), modular construction (Goh & Goh, 2019), assembled building (Song et al, 2005), housing industrialization, and housing industry modernization (Wen, 2013(Wen, , 2018. After the initial round of data collection, a manual check was conducted to identify state-level policies based on the following criteria.…”
Section: Data Collectionmentioning
confidence: 99%
See 1 more Smart Citation
“…To identify PBP documents, a wide range of keywords were used to search for those related to PB, including industrialized building (Zabihi et al, 2013), off-site construction (Arashpour et al, 2015), prefabricated construction/building (Tan et al, 2019), modular construction (Goh & Goh, 2019), assembled building (Song et al, 2005), housing industrialization, and housing industry modernization (Wen, 2013(Wen, , 2018. After the initial round of data collection, a manual check was conducted to identify state-level policies based on the following criteria.…”
Section: Data Collectionmentioning
confidence: 99%
“…Of the PB-related studies conducted to date, the majority have focused on PB technologies (e.g. Arashpour et al, 2015;Goh & Goh, 2019), project management methods for PBs (e.g. Mao et al, 2016;Steinhardt & Manley, 2016), and strategy analyses of PB application (e.g.…”
Section: Introductionmentioning
confidence: 99%
“…Innella et al (2019) clarified the importance of implementing lean techniques in the modular building industry, including all the production process stages. Moreover, M. Goh and Y. M. Goh (2019) provided and evaluated recommendations to improve modular construction efficiency through application of lean concepts by conducting a detailed simulation for Prefabricated Prefinished Volumetric Construction.…”
Section: Causes Of Wastes and Lean Construction Implementationmentioning
confidence: 99%
“…Simulation of the VSM allows the team to try out the suggested improvements without causing any interruptions, and it enables the ideas to be tested with less cost and time. VSM and simulation are a natural combination, as each one enhances the other's value in bottleneck detection and making the production process leaner [3,23,28]. Usually, an accurate model of the current state is achieved through an iterative process to ultimately reach a verified model.…”
Section: Integration Of Vsm Toc and Simulationmentioning
confidence: 99%
“…In order to achieve such, it is vital to reduce bottlenecks and waste sources and aim to achieve maximum efficiency. Lean manufacturing is a revolutionary philosophy that identifies non-value-adding activities as waste and ultimately aims to eliminate such activities from all processes [1][2][3][4]. Many tools have been used to achieve lean manufacturing, such as cellular manufacturing, Just in Time (JIT), total productive maintenance (TPM), 5S and Value stream mapping (VSM).…”
Section: Introductionmentioning
confidence: 99%