2020
DOI: 10.1061/(asce)la.1943-4170.0000340
|View full text |Cite
|
Sign up to set email alerts
|

Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
18
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(18 citation statements)
references
References 42 publications
0
18
0
Order By: Relevance
“…It is about time that integration is taken to another level in these delivery methods where project members are engaged in a much faster way that allows for real-time monitoring through intuitive interfaces with the help of the technological innovations that transformed the construction industry [33][34][35][36]. In fact, Demetracopoulou et al [37] confirmed that there is a strong positive correlation between the characteristics that lead to innovation opportunities and the level of integration between designer and contractor.…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…It is about time that integration is taken to another level in these delivery methods where project members are engaged in a much faster way that allows for real-time monitoring through intuitive interfaces with the help of the technological innovations that transformed the construction industry [33][34][35][36]. In fact, Demetracopoulou et al [37] confirmed that there is a strong positive correlation between the characteristics that lead to innovation opportunities and the level of integration between designer and contractor.…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…For instance, stakeholders’ potential in influencing the processes and outcomes, and its likelihood of success, has been well-documented in project management and stakeholders’ literature. Project managers’ decision on competency is significantly associated with their perception of the project’s likelihood of being successfully implemented (Demetracopoulou et al. , 2020).…”
Section: Resultsmentioning
confidence: 99%
“…This indicates that the application of DST-DB was well-understood by the participants in both project situations; thus, suggesting their interest in applying DST-DB practically. However, the effectiveness of a design-build method selection depends on distinct characteristics, desired goals, institutional constraints and the proper allocation of risk (Demetracopoulou et al. , 2020).…”
Section: Resultsmentioning
confidence: 99%
“…Other studies identified the CSFs of construction projects by the certain construction project delivery methods (PDM) which determine each stage in the life cycle, including design, construction and maintenance and required a clear definition of responsibilities of each project participant [14,46]. For instance, CSFs are studied for common PDMs including designing, biding and building (DBB) [83,84], construction management under risks (CMR) [85], the PDM of designing and building (DB) [83,86,87]. In a prior study by Ling et al [88], DBB and DB projects were investigated and 59 potential CSFs affecting construction project performance were extracted and grouped.…”
Section: Literature Reviewmentioning
confidence: 99%