Day 2 Tue, May 03, 2016 2016
DOI: 10.4043/27037-ms
|View full text |Cite
|
Sign up to set email alerts
|

Lessons Learnt From Pre-Commissioning of Large Diameter Pipeline Using Coiled Tubing in Ultra-Deep Water Offshore Brazil

Abstract: The installation of flowlines in ever deeper and remote areas requires the usage of specific technologies in order to carry out pre-commissioning operations. As the water depth increases, the weight of the conventional equipment to be deployed to perform the required operations becomes a major issue and alternate solutions are thus required. An option lies in using Coiled Tubing. Coiled Tubing consists of continuous pipe that has been coiled around a reel and can be deployed and recovered according to operatio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…As seen in Figure 4, it was observed that the highest generated publications were 19 publications in 2020, followed by 14 publications in 2014 and 2016, then 13 documents in 2019, and 12 documents in 2021. However, there are limited publications found on the installation of marine hoses [160][161][162][163][164][165][166][167][168][169][170] compared to other marine systems [171][172][173][174][175][176][177][178][179][180].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…As seen in Figure 4, it was observed that the highest generated publications were 19 publications in 2020, followed by 14 publications in 2014 and 2016, then 13 documents in 2019, and 12 documents in 2021. However, there are limited publications found on the installation of marine hoses [160][161][162][163][164][165][166][167][168][169][170] compared to other marine systems [171][172][173][174][175][176][177][178][179][180].…”
Section: Resultsmentioning
confidence: 99%
“…As seen in Figure 4, it was observed that the highest generated publications were 19 publications in 2020, followed by 14 publications in 2014 and 2016, then 13 documents in 2019, and 12 documents in 2021. However, there are limited publications found on the installation of marine hoses [160][161][162][163][164][165][166][167][168][169][170] compared to other marine systems [171][172][173][174][175][176][177][178][179][180]. As observed in Figure 5a, the highest publications by subject area were in engineering, with 212 publications (42.7%), energy, with 99 publications (19.9%), earth and planetary sciences, with 46 publications (9.3%), environmental science with 23 publications (7.4%), chemical engineering with 23 publications (4.6%), materials science with 21 publications (4.2%), and agricultural and biological sciences with 16 publications (3.2%), among other subject areas.…”
Section: Resultsmentioning
confidence: 99%