2023
DOI: 10.1049/gtd2.12846
|View full text |Cite
|
Sign up to set email alerts
|

Load shedding method aimed fast voltage recovery to prevent interference of FIDVR with UV relays

Abstract: The fault-induced delayed voltage recovery (FIDVR) and short-term voltage instability (STVI) phenomena appear in networks with high penetration of induction motor loads because the increase in requested reactive powers of these loads prevents the voltages from quickly returning to their pre-fault levels. Load shedding (LS) is one of the ways to deal with FIDVR and STVI and reduce the imbalance between the generation and demand of reactive power. Under-voltage (UV) relays that disconnect loads during voltage dr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
references
References 36 publications
0
0
0
Order By: Relevance