2016
DOI: 10.1016/j.engstruct.2016.08.030
|View full text |Cite
|
Sign up to set email alerts
|

Longitudinal force on transmission towers due to non-symmetric downburst conductor loads

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 19 publications
0
9
0
Order By: Relevance
“…As such, Elawady and El Damatty (2016) conducted an elaborate parametric study to find the configuration resulting in the highest longitudinal loading. To do so, the authors utilized the technique described by to compute the reactions on a six-span conductor system.…”
Section: Problem Definitionmentioning
confidence: 99%
See 4 more Smart Citations
“…As such, Elawady and El Damatty (2016) conducted an elaborate parametric study to find the configuration resulting in the highest longitudinal loading. To do so, the authors utilized the technique described by to compute the reactions on a six-span conductor system.…”
Section: Problem Definitionmentioning
confidence: 99%
“…While Aboshosha et al (2016), Lin et al (2012), Shehata et al (2005), Shehata and El Damatty (2007), El Damatty (2011), andElawady et al (2017) considered the combined tower-line system, Mara et al (2010), Mara and Hong (2013), and Savory et al (2001) have considered the effect of downburst loading on the supporting tower structures alone with no regard for the conductors. On the other hand, Aboshosha and El Damatty (2014a,b); Aboshosha and El Damatty (2015b), Darwish et al (2010), and Elawady and El Damatty (2016) have focused on the conductors, studying their impact either on the loading process, or their aerodynamic damping. The current study is an extension of the work performed by Elawady and El Damatty (2016).…”
Section: Introduction Backgroundmentioning
confidence: 99%
See 3 more Smart Citations