2015
DOI: 10.1049/iet-gtd.2015.0478
|View full text |Cite
|
Sign up to set email alerts
|

Look‐ahead distribution power restoration analysis based on integrated operation of distribution automation and advanced metring infrastructure systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 25 publications
0
1
0
Order By: Relevance
“…In the second category, a large body of studies has focused on reducing DA implementation costs. For example, several approaches are developed for optimal placement of DA equipment including automatic switches, fault indicators and measurement units [7][8][9][10][11]. Their objective is to reduce the capital costs of DA, as well as maximising the economic savings due to installing this system.…”
Section: Introductionmentioning
confidence: 99%
“…In the second category, a large body of studies has focused on reducing DA implementation costs. For example, several approaches are developed for optimal placement of DA equipment including automatic switches, fault indicators and measurement units [7][8][9][10][11]. Their objective is to reduce the capital costs of DA, as well as maximising the economic savings due to installing this system.…”
Section: Introductionmentioning
confidence: 99%