2021
DOI: 10.1007/s40031-021-00596-4
|View full text |Cite
|
Sign up to set email alerts
|

M Class Synchrophasor Compliance for Real-time Monitoring of Smart Power Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 25 publications
0
2
0
Order By: Relevance
“…The objective of this project was focusing on the real-time observation of the operating grid. India has five regions with power grids serving the corresponding regional grids, namely the northern, eastern, southern, western, and north-east regions [8,9]. All the regional grids were operating individually until the 1990s, but with the time changes, the interconnection between the grids was formed to make a central grid operating at a single frequency.…”
Section: Backgroundsmentioning
confidence: 99%
See 1 more Smart Citation
“…The objective of this project was focusing on the real-time observation of the operating grid. India has five regions with power grids serving the corresponding regional grids, namely the northern, eastern, southern, western, and north-east regions [8,9]. All the regional grids were operating individually until the 1990s, but with the time changes, the interconnection between the grids was formed to make a central grid operating at a single frequency.…”
Section: Backgroundsmentioning
confidence: 99%
“…The result is that the entity is zero if there is no interconnection of tie-line between a bus from area-1 and another bus from area-2; otherwise, entities will be one. The reliability constraints are formulated as shown in equation (7)(8)(9)(10). The power flow constraints result in the optimum solution for load interruption during load flow analysis [30].…”
Section: A C C E P T E Dmentioning