2012
DOI: 10.3233/wor-2012-1046-5612
|View full text |Cite
|
Sign up to set email alerts
|

Macroergonomic intervention for work design improvement and raw materials waste reduction in a small footwear components company in Rio Grande do Sul-Brazil

Abstract: This article presents a macroergonomic intervention carried out in a small footwear components company located in the state of Rio Grande do Sul, Brazil. The company´s demand was related to the waste of the expensive raw-material (thermoplastic polyurethane or TPU) used to manufacture the components (high heels pegs). According to the managerial staff, the waste was workers responsibility due to the craft characteristic of the process. A participative method was used to evaluate the problems, propose and imple… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2017
2017
2017
2017

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 9 publications
0
0
0
Order By: Relevance