SPE/IATMI Asia Pacific Oil &Amp; Gas Conference and Exhibition 2015
DOI: 10.2118/176046-ms
|View full text |Cite
|
Sign up to set email alerts
|

Managed Pressure Drilling Significantly Reduces Drilling Costs on Extremely Challenging UltraHT Wells in the Gulf of Thailand

Abstract: PTTEP in the Gulf of Thailand faced costly challenges while conventionally drilling several narrow operating window ultra high temperature (ultraHT) wells with formation temperature up to 220°C (428°F). In the ultraHT sections, the operator encountered serious ballooning issues that resulted in severe non-productive time (NPT) and difficulty reaching well total depth (TD). Additionally, formation pressure uncertainty in the steep pressure ramp region posed additional drilling challenges due to high risk of inf… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles