2016
DOI: 10.1080/17452007.2016.1140016
|View full text |Cite
|
Sign up to set email alerts
|

Managing pile foundation and land cost for high-rise buildings in the early design stages

Abstract: High-rise buildings in areas with thick layers of sedimentation require deep pile foundations which lead to higher costs. The height, layout and location of high-rise buildings are crucial to reducing costs. The aim of this paper is to propose a cost estimation model for buildings, which includes pile foundation and land cost. The element method for cost control and structural theories are integrated in order to predict costs per m² of floor. Specific soil characteristics have been combined with wind and seism… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 24 publications
(24 reference statements)
0
0
0
Order By: Relevance