2012
DOI: 10.1080/00207543.2011.603707
|View full text |Cite
|
Sign up to set email alerts
|

Material and capacity requirements planning with dynamic lead times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
25
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 30 publications
(25 citation statements)
references
References 21 publications
0
25
0
Order By: Relevance
“…system in which individual elements can affect themselves through a chain of cause and effect [13,[16][17][18]. The general process of simulation, which is also accepted in this work, basically involves the processes of building simulation models, planning and execution of simulation experiment and analyses the results and draws conclusions [2,4,14,19].…”
Section: Development Of Model For Simulationmentioning
confidence: 99%
See 3 more Smart Citations
“…system in which individual elements can affect themselves through a chain of cause and effect [13,[16][17][18]. The general process of simulation, which is also accepted in this work, basically involves the processes of building simulation models, planning and execution of simulation experiment and analyses the results and draws conclusions [2,4,14,19].…”
Section: Development Of Model For Simulationmentioning
confidence: 99%
“…In this respect, a lot of papers proposes methods of improving the coordination, methods of optimizing the process route [8,9], production lot size [10] and lead time in order to optimize the planning [1,4]. Nevertheless these researches only consider the local optimization or improvement of system.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…The methods are about improving the schedule of lot-size and lead time [4][5][6][7], adjusting the work capacity and balance algorithm [8], optimizing the process route [9][10], and so on. But these researches only consider the local optimization or improvement of ERP system, not resolve the problems in ERP system radically.…”
Section: Introductionmentioning
confidence: 99%